B2B Garden SIPs Kits

Technical Notes (unless instructed otherwise)
  1. We will specify our recommended panel thickness
  2. We step the outline of the building in by 50mm to allow for your batten and cladding
  3. We allow a 5mm tolerance to the top and sides of window and door sizes
  4. The point of order is upon payment of a 50% deposit
  5. We require a 4-6 week lead-time for supply & delivery
Design Stage (from deposit paid)TimelineApproval Required
Stage one - elevations and floorplan* Week 1 - 2For comment (within 2 days)
Stage two – elevations and floor plan sign-offWeek 2 - 3Adobe E-sign (within 2 days)
Stage three - production drawings for manufacturingWeek 4 - 5None

*  showing the location of joists or if SIPs floor where panel timbers are – this will inform their groundworkers where to install screw piles)

Design Changes
  • Free of charge: up to one round of design changes prior to Stage 2.
  • From Stage 2 onwards, once drawings have been signed-off and approved, we are unable to make design changes as this will already be in production. The client is to pay in full for the aborted project, and/or a new order will need to be placed, subject to the lead times at that point.
  • Further changes will be charged at £200 ex VAT per change, including minor and major.